CE FCC Heated Jacket Power Pack 5V USB Power Pack For Heated Jacket
Product Details:
Place of Origin: | China |
Brand Name: | RAGIOE |
Certification: | FCC |
Model Number: | LX-BP03 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1000 PCS |
---|---|
Price: | Negotiable |
Packaging Details: | Box |
Delivery Time: | 25~40 Days |
Payment Terms: | T/T, Western Union, MoneyGram |
Supply Ability: | 100000 Sets Per Month |
Detail Information |
|||
Cell Type: | 18650 Lithium-ion | Nominal Capacity: | 10050mAh |
---|---|---|---|
Nominal Power: | 36.18Wh | USB-A Port: | DC5V 2A Output |
Type-C Port: | DC5V 2A Input | LED Display: | 4 Blue LEDs |
High Light: | 5V USB Power Pack For Heated Jacket,5v battery pack for heated vest,CE FCC Heated Jacket Power Pack |
Product Description
USB 5V 2A Power Bank 10050mAh For Air Conditioning Clothing LED Strip Monitor Camera Wifi Router
Main features:
- USB-A 5V 2A output
- Type-C 5V2A input
- Grade-A Lithium-ion cells
- 500 cycles life
Specifications:
Product name | 5V USB power bank | ||
Cell type | Grade-A 18650 Li-ion | ||
Nominal capacity | 10050mAh | ||
Nominal power | 36.18Wh | ||
LED display | 4 blue LEDs | ||
USB-A output | DC5V 2A | ||
Type-C input | DC5V 2A | ||
Size | 99*62.5*23mm | ||
Weight | 188g | ||
Color | Black, can be customized | ||
Working life | 500 cycles | ||
Certificates | CE FCC | ||
M.O.Q. | 1000 PCS | ||
OEM/ODM M.O.Q. | 1000 PCS | ||
Lead time for sample | 7~14 days | ||
Lead time for bulk order | 25~40 days (depends on quantity) | ||
Payment terms | 40% deposit, all balance before delivery, T/T | ||
Warranty | One year |
Application:
Heated clothing, heated jacket, heated vest, air conditioned clothing, mobile electronics, etc.
Detail picture
FAQ
Q1: What is your MOQ?
A: Our standard MOQ is 1000pcs, but small quantity for the first trial order is acceptable.
Q2: Can I get sample?
A: Sure, we’ll charge certain sample fee, but can be refunded when order is up to certain quantity.
Q3: How long is the sample lead time?
A: If we have stock, it takes 1~3 days. If no stock, it takes 7~14 days.
Q4: How long is the mass production lead time?
A: It takes 30~60 days (depends on quantity).
Q5: Can you provide OEM service?
A: Yes, generally OEM MOQ is 1000pcs.
Q6: What format of the file do you need if I want my own design?
A: Files best in AI, CDR, or PDF format.
Q7: What are your shipping methods and freight charge?
A: Take cost and time into consideration, we would suggest to ship by express for small quantity, and large quantity by sea, cost depends on the shipping method and exact quantity.
Q8: What are your payment terms?
A: We accept payment by T/T, generally 50% deposit + 50% balance.