• 7.4V Far Infrared Carbon Fiber Heating Pad For Heated Gloves
  • 7.4V Far Infrared Carbon Fiber Heating Pad For Heated Gloves
7.4V Far Infrared Carbon Fiber Heating Pad For Heated Gloves

7.4V Far Infrared Carbon Fiber Heating Pad For Heated Gloves

Product Details:

Place of Origin: China
Brand Name: RAGIOE
Certification: CE
Model Number: No

Payment & Shipping Terms:

Minimum Order Quantity: 1000 PCS
Price: Negotiable
Packaging Details: Box
Delivery Time: 25~40 Days
Payment Terms: T/T, Western Union, MoneyGram
Supply Ability: 100000 Sets Per Month
Get Best Price Contact Now

Detail Information

Product Name: Gloves Carbon Fiber Heating Pad Work Voltage: 7.4V
Heating Area: Fingers And Hand Back DC Connector: DC3.5*1.35mm, Can Be Customized
High Light:

Far Infrared Carbon Fiber Heating Pad

,

Heated Gloves Carbon Fiber Heating Pad

,

7.4V Carbon Fiber Heating Pad

Product Description

Far Infrared Electric Caron Fiber Heating Pad / Element For Heated Gloves

 

Main features:

  • Far infrared carbon fiber material
  • Fingers and hand back heating
  • 7.4V work voltage
  • Washable

 

Specifications:

Product name Gloves carbon fiber heating pad
Work voltage 7.4V
Heating area Fingers and hand back
DC connector DC3.5*1.35mm, can be customized
Certificates CE FCC
M.O.Q. 1000 PCS
OEM/ODM M.O.Q. 1000 PCS
Lead time for sample 7~14 days
Lead time for bulk order 25~40 days (depends on quantity)
Payment terms 40% deposit, all balance before delivery, T/T
Warranty One year

 

Application:

Heated gloves, heated mittens, etc.

 

Detail picture

7.4V Far Infrared Carbon Fiber Heating Pad For Heated Gloves 0

7.4V Far Infrared Carbon Fiber Heating Pad For Heated Gloves 1

FAQ


Q1: What is your MOQ?

A: Our standard MOQ is 1000pcs, but small quantity for the first trial order is acceptable.

Q2: Can I get sample?

A: Sure, we’ll charge certain sample fee, but can be refunded when order is up to certain quantity.

Q3: How long is the sample lead time?

A: If we have stock, it takes 1~3 days. If no stock, it takes 7~14 days.

Q4: How long is the mass production lead time?

A: It takes 30~60 days (depends on quantity).

Q5: Can you provide OEM service?

A: Yes, generally OEM MOQ is 1000pcs.

Q6: What format of the file do you need if I want my own design?

A: Files best in AI, CDR, or PDF format.

Q7: What are your shipping methods and freight charge?

A: Take cost and time into consideration, we would suggest to ship by express for small quantity, and large quantity by sea, cost depends on the shipping method and exact quantity.

Q8: What are your payment terms?

A: We accept payment by T/T, generally 50% deposit + 50% balance.

Want to Know more details about this product
I am interested in 7.4V Far Infrared Carbon Fiber Heating Pad For Heated Gloves could you send me more details such as type, size, quantity, material, etc.
Thanks!
Waiting for your reply.