5V Fan Cooled Jacket Air Conditioned Apparel Uniform 3XL 4XL Size

5V Fan Cooled Jacket Air Conditioned Apparel Uniform 3XL 4XL Size

Product Details:

Place of Origin: China
Brand Name: RAGIOE
Certification: PSE
Model Number: LX-CC002

Payment & Shipping Terms:

Minimum Order Quantity: 1000 Sets
Price: Negotiable
Packaging Details: Box
Delivery Time: 25~40 days
Payment Terms: T/T, Western Union, MoneyGram
Supply Ability: 3000 Sets Per Day
Get Best Price Contact Now

Detail Information

Material: Cotton Function: Cool Body
Gender: Unisex Closure Type: Zip
Season: Summer Use: Construction, Farming, Etc.
High Light:

5V Fan Cooled Jacket

,

5V Air Conditioned Apparel

,

3XL 4XL Air Conditioned Apparel

Product Description

5V Fan Cooling Air Conditioning Clothes/Vest/Apparel/Uniform/Workwear

 

Main features:

  • Zip closure
  • Cotton material
  • 3 or 4 speed control
  • 9 blades and brushless fans

 

Description:

  • The air conditioned apparel material is think, high wind resistance, and wear comfortable. Sun protection and quick dry, comfortable to wear and enjoy outdoor activities easily for hot weather.
  • Come with removable fan that moves fresh air along the back and shoulder, sweat evaporates instantaneously that make you feel cooling in hot day. You can feel very comfortable at work, avoid heavy sweating and heat stroke.With ON/OFF button on jacket’s chest, you can easily turn heating on/ change heating gears/ turn heating off just by pressing it.
  • Two types accessories for option: one is 5V by power bank, the other is 12V by rechargeable Lithium-ion battery pack.

 

Specifications:

 

Model No. LX-CC002
Cloth material Premium cotton
Color White, can be customized
Size S M L XL XXL 3XL 4XL
Application Laborers who work in hot environments hot weather
Accessory option ① Fans * 2PCS
Speed up controller * 1PC
5V 10050mAh power bank * 1PC
USB charge cable *1PC
Accessory option ② Fans * 2PCS
Connection cable *1PC
7.2V 6700mAh Li-ion battery * 1PC
8.4V1.2A charger*1PC
Package OPP bag or customized package
Certificates PSE
M.O.Q. 1000 Sets
OEM/ODM M.O.Q. 1000 Sets
Lead time for sample 7~14 days
Lead time for bulk order 25~40 days (depends on quantity)
Payment terms 50% deposit, all balance before delivery, T/T
Warranty One year

 

How to use:

  • Open the package, check the products carefully, and take them gently;
  • Charge battery full before using;
  • Install two fans into clothes;
  • Connect two fans with speed up controller or connection cable;
  • Plug into power bank or Li-ion battery pack;
  • Long press speed up controller or Li-ion battery pack’s button to turn power on;
  • Short press speed up controller or Li-ion battery pack’s button to change wind speed;
  • Long press to turn power off;
  • Remove fans and battery before wash.

 

Storage & Warnings:

  • It is important to maintain at least 25% of your battery power when not in use. Failure to do so will result in performance problems and reduced battery life.
  • Disconnect the battery from the vest when not in use because even when it is turned off, the vest will continue to slowly drain power from the battery.
  • Use specified charger to charge battery.

 

Detail picture of Cooling fan Jacket

5V Fan Cooled Jacket Air Conditioned Apparel Uniform 3XL 4XL Size 0

5V Fan Cooled Jacket Air Conditioned Apparel Uniform 3XL 4XL Size 1

 

How to install fans

5V Fan Cooled Jacket Air Conditioned Apparel Uniform 3XL 4XL Size 2  

Applications:

This air conditioned clothes are made for laborers who work in hot environments hot weather. By staying comfortable and cool throughout the work experience, laborers can concentrate on the job instead of being distracted by trying to minimize the physical effects of hot environments. The following is a list of just many kinds of laborers that are currently using this innovative technology: Construction Laborer, Landscapers, Roofers, Pavers, Archaeologists,Machinists, Factory Workers, fishing, cycling .......

 

FAQ


Q1: What is your MOQ?

A: Our standard MOQ is 1000pcs, but small quantity for the first trial order is acceptable.

Q2: Can I get sample?

A: Sure, we’ll charge certain sample fee, but can be refunded when order is up to certain quantity.

Q3: How long is the sample lead time?

A: If we have stock, it takes 1~3 days. If no stock, it takes 7~14 days.

Q4: How long is the mass production lead time?

A: It takes 25~60 days (depends on quantity).

Q5: Can you provide OEM service?

A: Yes, generally OEM MOQ is 1000pcs.

Q6: What format of the file do you need if I want my own design?

A: Files best in AI, CDR, or PDF format.

Q7: What are your shipping methods and freight charge?

A: Take cost and time into consideration, we would suggest to ship by express for small quantity, and large quantity by sea, cost depends on the shipping method and exact quantity.

Q8: What are your payment terms?

A: We accept payment by T/T, generally 50% deposit + 50% balance. 

Want to Know more details about this product
I am interested in 5V Fan Cooled Jacket Air Conditioned Apparel Uniform 3XL 4XL Size could you send me more details such as type, size, quantity, material, etc.
Thanks!
Waiting for your reply.