Fluorescent Reflective Fan Cooling Vest Double Fan Hi Vis Shirts
Product Details:
Place of Origin: | China |
Brand Name: | RAGIOE |
Certification: | PSE |
Model Number: | LX-CV014 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1000 Sets |
---|---|
Price: | Negotiable |
Packaging Details: | Box |
Delivery Time: | 25~40 days |
Payment Terms: | T/T, Western Union, MoneyGram |
Supply Ability: | 3000 Sets Per Day |
Detail Information |
|||
Cloth Material: | Polyester Fiber | Style: | Cooling Vest |
---|---|---|---|
Color: | Can Be Customized | Size: | S M L XL XXL 3XL 4XL |
Season: | Summer | Application: | Indoor Or Outdoor Activities In Hot Weather |
High Light: | Reflective Fan Cooling Vest,Fluorescent Fan Cooling Vest,Double Fan Hi Vis Shirts |
Product Description
Fluorescent Reflective Worker Cooling Vest Summer With Fan Air Condition Clothes Double Fan Best Quality Hi Vis Shirts
Main features:
- Polyester fabric
- Zipper closure
- 9 blades fans
- 3 or 4 wind speed control
Description:
- Body cooling vest made of 100% polyester, skin-friendly fabric. It is also a sun protection vest that heat resistant, breathability, light wieght for easy to carry, also good for travelling. Fan cooling vest can help you keep cooler in hot job site conditions.
- This cooling vest come with removable fans that move fresh air along the back and shoulder, sweat evaporates instantaneously that make you feel cooling in hot day. Cool vest that manages heat stress, you can feel very comfortable at work, avoid heavy sweating and heat stroke.
- Two fans systems for option: one is powered by 7.4V Lithium-ion battery pack and has four air flow modes, the other is powered by 5V USB power bank and has three air flow modes.
- Vest is washable after remove fans and batteries.
Specifications:
Model No. | LX-CV014 |
Cloth material | Polyester fabric |
Color | Green, can be customized |
Size | S M L XL XXL 3XL 4XL |
Application | Indoor & outdoor activities in hot environments hot weather |
Accessory option ① | Fans * 2PCS |
Speed up controller * 1PC | |
5V 10050mAh power bank * 1PC | |
USB charge cable *1PC | |
Accessory option ② | Fans * 2PCS |
Connection cable *1PC | |
7.2V 6700mAh Li-ion battery * 1PC | |
8.4V1.2A charger*1PC | |
Package | OPP bag or customized package |
Certificates | PSE |
M.O.Q. | 1000 Sets |
OEM/ODM M.O.Q. | 1000 Sets |
Lead time for sample | 7~14 days |
Lead time for bulk order | 25~40 days (depends on quantity) |
Payment terms | 50% deposit, all balance before delivery, T/T |
Warranty | One year |
Use notices:
- Open the package, check the products carefully, and take them gently;
- Charge battery full before using;
- Install two fans into clothes;
- Connect two fans with speed up controller or connection cable;
- Plug into power bank or Li-ion battery pack;
- Long press speed up controller or Li-ion battery pack’s button to turn power on;
- Short press speed up controller or Li-ion battery pack’s button to change wind speed;
- Long press to turn power off;
- Remove fans and battery before wash.
Storage & Warnings:
- It is important to maintain at least 25% of your battery power when not in use. Failure to do so will result in performance problems and reduced battery life.
- Disconnect the battery from the vest when not in use because even when it is turned off, the vest will continue to slowly drain power from the battery.
- Use specified charger to charge battery.
Detail picture of Cooling fan Jacket
Applications:
The fan vest is great for individuals working in high-temperature indoor or outdoor environments, like municipal workers, survey crews, crossing guard, and parking attendants. It is also suitable for recreational such as cycling, wilderness hiking, jogging, motorcycle.
FAQ
Q1: What is your MOQ?
A: Our standard MOQ is 1000pcs, but small quantity for the first trial order is acceptable.
Q2: Can I get sample?
A: Sure, we’ll charge certain sample fee, but can be refunded when order is up to certain quantity.
Q3: How long is the sample lead time?
A: If we have stock, it takes 1~3 days. If no stock, it takes 7~14 days.
Q4: How long is the mass production lead time?
A: It takes 25~60 days (depends on quantity).
Q5: Can you provide OEM service?
A: Yes, generally OEM MOQ is 1000pcs.
Q6: What format of the file do you need if I want my own design?
A: Files best in AI, CDR, or PDF format.
Q7: What are your shipping methods and freight charge?
A: Take cost and time into consideration, we would suggest to ship by express for small quantity, and large quantity by sea, cost depends on the shipping method and exact quantity.
Q8: What are your payment terms?
A: We accept payment by T/T, generally 50% deposit + 50% balance.